Qentrix Labs, Inc. · Phase 0
iUGNAY · Product & Architecture Foundation v0.1

G1 · Product Baseline Review

IUG-G1-RVW-001v0.1 · Draft / In ReviewReview: IUG-P0-G126 October 2026
Controlled draft — not implementation authority The complete 24-page iUGNAY Proposal & Functional Masterplan v1.0 (26 October 2026) is now received, checksum-verified and source-reconciled. Sponsor approval, pilot agreement, implementation authorization, official integrations and public partnership claims remain pending.

The reviewed product scope is source-aligned. G1 remains In Review — Sponsor Disposition Pending. Recommended disposition: Approve with Conditions only if the bounded scope, explicit exclusions and remaining responsibilities are accepted.

Principal findings

FindingSource / effectAssessment
Source v1.0 provenanceVerified 24-page PDF, 26 October 2026, SHA-256 indexedVerified; original PDF binary custody open
Product visionSix pillars, four editions; pp. 4–5, 12Aligned
Pilot stagingP0/P1/P2 and restricted domains; pp. 6–11, 23Aligned; sponsor acceptance open
Human authority and protected dataGovernment decisions/VAWC/health and AI boundaries; pp. 7–9, 11, 13, 15Guardrail preserved; LGU review pending
External claimsDILG/PhilSys/agency and payment access; pp. 14–16, 20–21Not approved; independent verification required
Pilot signoffTraining, acceptance metrics, security and restoration evidence; pp. 17–19Thresholds and pilot site open
Pilot permission distinctionPilot ambition on p. 2 versus resolution-in-principle on p. 22No implied procurement/go-live authority

Six proposed Sponsor dispositions

IDProposed G1 decision
G1-D01Accept the six-pillar product vision and four editions (without granting external authority)
G1-D02Accept Appendix A's minimum P0 boundary and retain P1/P2/gated exclusions
G1-D03Require local Citizen's Charter/source-of-record rules and authorized human approval
G1-D04Preserve restricted record separation and no autonomous AI public decisions
G1-D05Keep integrations, partnerships, provider contracts and pricing contingent
G1-D06Allow only a conditional product baseline, not a live pilot or software implementation

Five proposed G1 conditions

  1. G1-AC-01: PDF archival custody and source validation disposition
  2. G1-AC-02: Sponsor acceptance of the exact P0 functional ceiling and exception control
  3. G1-AC-03: Before operation, signed LGU pilot scope, Citizen's Charter, data authority and privacy accountability
  4. G1-AC-04: Numeric pilot KPIs, acceptance/UAT, support and go/adjust/defer decisions
  5. G1-AC-05: Independent authorization of external systems, provider arrangements and procurement before any such use
No G1 approval is recorded. G0 remains approved with its separate four conditions open; G2/G3 and software implementation are unapproved. View the detailed scope matrix.

Authoritative Markdown: IUG-G1-RVW-001 source on private GitHub. Human-readable summary; refer to source for normative detail.