Qentrix Labs, Inc. · Phase 0
iUGNAY · Product & Architecture Foundation v0.1

Phase 0 Review & Approval Gates

IUG-REV-001v0.1 · Approved with ConditionsReview: IUG-P0-G026 October 2026
Controlled draft — not implementation authority The complete 24-page iUGNAY Proposal & Functional Masterplan v1.0 (26 October 2026) is now received, checksum-verified and source-reconciled. Sponsor approval, pilot agreement, implementation authorization, official integrations and public partnership claims remain pending.

Four sequential checkpoints protect the distinction between an editable draft, an approved foundation and a separate implementation authorization.

GatePackageEvidence requiredDisposition
G0 · GovernanceIUG-GOV-001/002, registry, site, assets and IUG-G0-RVW-001Authority, document parity, source provenance, accessibility, public deployment and controlled decision statusApproved with Conditions — four conditions open
G1 · ProductIUG-P0-001, IUG-G1-TRC-001 and IUG-G1-RVW-001Source stage reconciliation, scoped pilot, privacy/official authority and decision contractIn Review — sponsor decision pending
G2 · ArchitectureIUG-P0-002Jurisdiction, privacy, integration, operational options and risk reviewAwaiting review
G3 · ConsolidationAll Phase 0 artifactsDocumented outcomes and bounded unresolved decisionsNot started

Read IUG-G0-RVW-001 — Governance Review Evidence. The sponsor separately approved G0 with conditions on 26 October 2026; all four conditions remain open. Read the decision record.

G1 review is now documented in IUG-G1-RVW-001 and IUG-G1-TRC-001. This is an operational review update from the document registry, not a change to the G0-approved gate structure.

Valid Gate Outcomes

Approved, Approved with conditions, Rejected, or Deferred — each with approver, date, version, evidence, owner and conditions. Conditional approvals remain conditioned until the sponsor closes them.

Recommended Review Sequence

  1. Assess G0 governance and documentation controls.
  2. Review verified 24-page v1.0 masterplan and revised P0/P1/P2 scope for G1; decide PDF binary archival policy.
  3. Evaluate architecture options and protective boundaries for G2.
  4. Perform a consolidated G3 review without assuming implementation is permitted.
Explicit implementation gate required laterNo reviewer disposition here grants authority to start application coding, database design or deployment.

Authoritative Markdown: IUG-REV-001 source on private GitHub. Human-readable summary; refer to source for normative detail.