iUGNAY · Product & Architecture Foundation v0.1
G0 Governance Review Evidence
Controlled draft — not implementation authority The complete 24-page iUGNAY Proposal & Functional Masterplan v1.0 (26 October 2026) is now received, checksum-verified and source-reconciled. Sponsor approval, pilot agreement, implementation authorization, official integrations and public partnership claims remain pending.
G0 review assesses repository governance, source authority, synchronised Markdown/HTML, brand integrity, publication and review controls. Sponsor approved G0 with conditions G0-AC-01 through G0-AC-04; fulfillment is pending.
G0 Review Criteria
| Review group | Observed evidence | Outcome |
|---|---|---|
| Repository and boundaries | Private iUGNAY repository, separate Phase 0 draft branch, no software implementation or cross-project writes | Pass |
| Authoritative source and publication | Versioned Markdown controls, human-readable HTML summaries and JSON registry | Pass |
| Controlled approvals | G0–G3 gate records, open decision register and explicit sponsor disposition required | Pass |
| Masterplan evidence | Verified 24-page v1.0 proposal checksum and page text; PDF binary retention unsettled | Conditional |
| Brand and user interface | Supplied black logo source, derived SVG, dark/light reversal, Phase 0 accordion, compact MHERC-inspired radii | Conditional: logo approval and live visual check |
| Public draft documentation | Site is published by sponsor; private GitHub source links require appropriate access | Conditional: disclosure policy |
G0 Acceptance Conditions
- G0-AC-01: Accept public draft-document classification and private-source link policy
- G0-AC-02: Confirm derivative logo fidelity and exact-PNG archival plan
- G0-AC-03: Redeploy the complete site with
site-v3.cssand check light/dark themes, 15/14/11/12px container radii, links and accessibility - G0-AC-04: Designate G0 approval authority and future gate-recorder responsibilities
Later Dependencies
Exact v1.0 PDF binary retention, a named pilot LGU, privacy/technical roles and acceptance metrics remain for G1/G2. The present evidence is not a build, contract or integration authorization.
G0 approved with conditions The Project Sponsor approved IUG-P0-G0 with conditions G0-AC-01 through G0-AC-04 on 26 October 2026. Evidence for completing each condition is still outstanding. Read the formal approval record.
Authoritative Markdown: IUG-G0-RVW-001 source on private GitHub. Human-readable summary; refer to source for normative detail.